Application Scenario
Tranformers, Switchgears & HV Cables
High Voltage (HV) installations and equipment are prone to partial discharge, when the electrical stress exceeds the dielectric withstand capabilities of a specific portion of the insulation. Repetitive discharges can lead to progressive deterioration of the insulation, eventually culminating in equipment failure, power outages, and safety hazards.
With PDzen Partial Discharge Monitoring System, we provide accurate detection and analysis of PD allow for timely maintenance and intervention, ultimately extending the lifespan of electrical equipment and ensuring the reliability of power systems.
Underground Cables
High Voltage (HV) and Extra High Voltage (EHV) cables and joints are often direct-buried at depths of 1.5 to 3 metres beneath roads and pavements. During road diversions or land redevelopment, excavation and earthworks in the vicinity can expose these assets to risks such as:
These direct and indirect impacts accelerate mechnical stress and ageing of cables and joints. Over time, such disturbances can initiate partial discharge (PD) activity, which is a leading indicator of insulation degradation and eventual failure.
High voltage cables affected during earth cave-ins
The PDzen Partial Discharge Monitoring System is specifically designed to detect early PD activity in disturbed cables and joints. By providing constant monitoring, supervision and snap shots PD detection, we ensure that:
Back to Info